Pipe Proofing (Pipe Roofing Umbrella System) Pipe Proofing
TUNNEL PRE-SUPPORT UMBRELLA

Pipe Proofing (Pipe Roofing Umbrella System)

The Pipe Proofing (Pipe Roofing Umbrella Arch) System is an advanced geotechnical pre-support solution designed to stabilize tunnel roofs, portals, and deep cavern excavations before excavation. Heavy-wall structural steel casing pipes (J80/M80 grade) are installed ahead of the tunnel face in an umbrella configuration, transferring overburden loads longitudinally to prevent crown collapse and surface subsidence.

Crown Arch Stability
Creates rigid protective canopy ahead of excavation
High Tensile Steel
J80/M80 grade offering up to 630 N/mm² tensile strength
Zero Settlement
Eliminates ground loss and surface subsidence
Single-Pass Installation
Drilled simultaneously with casing using concentric tooling
Speak to Geotechnical Engineer
ENGINEERING METRICS

TECHNICAL DATA & SPECIFICATIONS

Certified engineering tolerances, metallurgical grades, and load metrics for heavy geotechnical installations.

Pipe Proofing (Pipe Roofing Umbrella System) — Technical Data Sheet

Quality Assurance Standard: ISO 10208 / EN 14199

# Technical Metric Certified Specification
01
System Type
Umbrella Arch / Forepoling Pre-support
02
Casing Steel Grade
J80/M80 Structural Alloy Steel (EN 10025 / DIN 17100 St 52-3)
03
Yield Strength (Min)
355 N/mm²
04
Tensile Strength
490 – 630 N/mm²
05
Elongation (Min)
22%
06
Standard Pipe Diameters
76.2 mm, 88.9 mm, 114.3 mm, 139.7 mm, 168.3 mm
07
Standard Lengths
3m, 6m, 9m, 12m, 15m (Coupled)
08
Connection Method
Precision Threaded Casing Couplers or Starter Pipe Butt Weld
09
Drilling Compatibility
Concentric Symmetrix / Overburden Odex Tooling
10
Application
Tunnel Portals, Fault Zone Excavation, Weak Overburden Stabilization
100% Ultrasonic flaw tested and batch certified under ISO 9001:2015 QA procedures.
Request Mill Test Certificate (MTC)

The Pipe Proofing System provides paramount pre-support when driving tunnels through fault zones, unconsolidated slopes, and populated urban areas where ground settlement must be zero. By driving casing pipes ahead of the tunnel face, it establishes a load-bearing umbrella arch before rock excavation commences.

Steel Grade Mechanical Properties (Pipe Roofing Casing Pipes)

EN 10025 Standard DIN 17100 Equiv. Yield Min (N/mm²) Tensile Strength (N/mm²) Elongation Min (%) C Max Mn Max P Max S Max Si Max
J80/M80 St 52-3 355 490 – 630 22 0.20% 1.60% 0.035% 0.035% 0.55%
Sigricare Engineering Support
GET IN TOUCH

ENGINEERED FOR EXTREMES.
READY TO ASSIST.

HEAD OFFICE & WORKS

Ground Floor, Plot, No 42 B, Street No. 5, Rajinder Nagar Industrial Area, Rajendra Nagar, Sahibabad, Ghaziabad, Uttar Pradesh 201007

DIRECT RFQ DESK

REQUEST PROJECT QUOTATION

ONLINE